Product Q&A

« See More Q&A's

Neal writes

How far apart and deep should you drill in the cement slab for a termite treatment?

Answer:

The answer to this question is also in our How To Do A Termite Treatment Article.  For your garage, porch, patios, or other contiguous slabs against the home, you will need to get the termiticide underneath the concrete against the foundation. To do this you will need a hammer drill with a 1/2" x 18" drill bit. You drill holes throughout the concrete about 3-4 inches away from the wall or foundation, and about every 10"-12" apart. Once the holes are drilled, you fill at the same rate you did the trench, 4 gallons per 10 feet. To fill these I would recommend using the one gallon sprayer on a "pin stream" setting so you can force the liquid down the hole and not splash it everywhere. You can also use a funnel and pour the termiticide down the holes. It is difficult to get 4 gallons per 10 feet in the holes, so it is important that you use a long drill bit, at least 18" long so you can bore out enough dirt to hold the termiticide. Once the holes are filled all you need to do is patch them with a concrete patch filler you can buy at Home Depot or you can use our Trebor plugs that will close the hole with no concrete mess.

Answer last updated on: 04/21/2011

Was this answer helpful to you? Yes No

141 of 150 people found this answer helpful.

Dominion 2L Termiticide

Dominion 2L Termiticide

5 out of 5 stars

$37.98

Free Shipping*