J.j. from Dallas, Tx writes
Is it possible to use a shovel to force the soil away from the foundation by wedging a shovel in between to create a gap, and then pouring the mixed Termidor SC solution into the gap instead of creating a trench? Once soaked in, pressing the soil back against the foundation?
Per manufacturer, the most effective termite treatment would be digging the 6in x 6in trench around the foundation and applying Termidor SC per label. If the gap is close to the suggested trench requirements, we do not see where this would not be as effective.
Answer last updated on: 07/28/2016