Doug from New York writes
my driveway is attached to my house and connected to my stoop, which if I look in my basement is where I've seen mud trails; right underneath my stoop in the double 2x4 sill plate. Ok going to apply termidor sc with a trench on the other areas but my question is after I drill the holes in the slab which I hear is every foot, how do I apply the product? Do I just pour it in? And how much? And also how deep does the drill have to go into the ground?
Termidor SC can be applied in drilled holes every 10-12 inches by using a funnel or a sprayer set on a pin stream setting. The hole needs to drilled deep enough to apply 1/2 gallon of finished solution to each hole.
Answer last updated on: 06/05/2017